This project consisted of a fully automatic climbing system both inside and out.
No items found.
Easy Lifting
Savings on site with only 2 ties in a height of 3.3m.
A 33% Tie Saving
Savings on site with only 2 ties in a height of 3.3m.
Faster Assembly
Light-weight accessories & stronger panels mean fewer components.
Widest Panel Range
Minimum makeups and boxouts, ensuring maximum efficiency on your site.
Project Overview
This project consisted of a fully automatic climbing system both inside and out but with the flexibility of allowing platforms to lift independently.
Lifting platforms independently, rather than as a whole allowed the site to continue the working cycle and steel fixing as they went. With only one live anchor the customer achieved a 50% saving in this area along with more working space and a full enclosure of the core with light allowed through the edge protection with the 2mm holes in the cladding so you can see through.
Duration: 40 Weeks
27 Levels
Hydraulic Climbing Core Formwork
Keep up to date
Sign up and get the latest construction news straight to your inbox.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
By signing up you agree to receive the ADAPT Formwork email newsletter and other relevant business news and promotions from ADAPT. We’ll never share your details, see our Privacy Policy.
By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Privacy Policy for more information.